United States βΊ Grid βΊ Transmission lines βΊ Oklahoma
OCTARY USA Β· TRANSMISSIONTransmission lines in Oklahoma
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Map
Longest high-voltage lines
| Between | Voltage | Length |
|---|---|---|
| Hugo (345 Kv) β Sunnyside | 345 kV | 198 km |
| Seminole | 345 kV | 176 km |
| Thistle β Woodward | 345 kV | 172 km |
| Thistle β Woodward | 345 kV | 172 km |
| Woodward β Border | 345 kV | 152 km |
| Chouteau | 345 kV | 150 km |
| Kiamichi Station | 345 kV | 134 km |
| Kiamichi Station | 345 kV | 134 km |
| Riverside β Redbud | 345 kV | 128 km |
| Valliant β Northwest Texarkana | 345 kV | 127 km |
| Woodward | 345 kV | 125 km |
| Woodward | 345 kV | 125 km |
| Seminole β Draper | 345 kV | 115 km |
| Muskogee β Fort Smith | 345 kV | 114 km |
| Valliant β Pittsburg | 345 kV | 113 km |
| Seminole β Arcadia | 345 kV | 113 km |
| Clarksville β Chambers Springs | 345 kV | 110 km |
| Lawton East Side | 345 kV | 107 km |
| Rose Hill β Charles D. Lamb Energy Center | 345 kV | 100 km |
| Sooner β Spring Creek | 345 kV | 100.0 km |
| Chisholm | 345 kV | 96.8 km |
| Tatonga β Mathewson | 345 kV | 95.7 km |
| Tatonga β Mathewson | 345 kV | 95.6 km |
| Johnston County (og&e) Substation β Pittsburg | 345 kV | 92.5 km |
| Lawton East Side β Minco | 345 kV | 91.4 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Public Service Co Of Oklahoma10,253 km Β· 1,272 km at 345 kV+
- Oklahoma Gas & Electric Co9,334 km Β· 1,879 km at 345 kV+
- Tri-county Electric Coop, Inc1,160 km Β· 103 km at 345 kV+
- Southwestern Power Administration633 km
- Empire District Electric Co110 km Β· 110 km at 345 kV+
- Northeast Oklahoma Electric Co53.8 km
- Kansas Gas & Electric Co32.9 km
- Southwestern Electric Power Co29.2 km
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants