| Between | Voltage | Length |
|---|---|---|
| Mc Knight β Daniel Station | 500 kV | 243 km |
| Hartburg | 500 kV | 207 km |
| Baxter Wilson β Sterlington | 500 kV | 115 km |
| Franklin β Bogalusa | 500 kV | 115 km |
| Nelson β Richard | 500 kV | 95.6 km |
| Mc Knight β Franklin | 500 kV | 90.0 km |
| Willow Glen (500kv) β Waterford 500kv | 500 kV | 84.2 km |
| Mount Olive | 500 kV | 81.9 km |
| El Dorado Substation β Sterlington | 500 kV | 81.8 km |
| Mount Olive β El Dorado Substation | 500 kV | 81.2 km |
| Wells β Webre | 500 kV | 63.9 km |
| Mc Knight β Fancy Point | 500 kV | 44.4 km |
| Big Cajun 2 β Webre | 500 kV | 42.7 km |
| Webre | 500 kV | 40.6 km |
| Coly β Willow Glen (500kv) | 500 kV | 33.7 km |
| Hartburg | 500 kV | 29.4 km |
| Mc Knight β Coly | 500 kV | 29.3 km |
| Richard β Wells | 500 kV | 26.3 km |
| Nelson | 500 kV | 13.8 km |
| Substation names not reported | 500 kV | 11.6 km |
| Willow Glen (500kv) | 500 kV | 8.6 km |
| Sterlington β Sterlington | 500 kV | 6.4 km |
| Sterlington β Sterlington | 500 kV | 6.3 km |
| Big Cajun 2 β Fancy Point | 500 kV | 5.0 km |
| Sterlington β Sterlington | 500 kV | 0.6 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Entergy Louisiana LLC5,448 km Β· 585 km at 345 kV+
- Entergy Louisiana Inc2,492 km Β· 94.9 km at 345 kV+
- Southwestern Electric Power Co725 km Β· 184 km at 345 kV+
- Entergy Gulf States - La LLC615 km
- Entergy New Orleans, LLC207 km
- Entergy200 km
- Cleco Power LLC193 km
- Entergy Arkansas Inc123 km Β· 92.8 km at 345 kV+
- Entergy Mississippi Inc104 km
- Cleco Cor49.1 km
- Mississippi Power Co14.1 km
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants