United States βΊ Grid βΊ Transmission lines βΊ Nebraska
OCTARY USA Β· TRANSMISSIONTransmission lines in Nebraska
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Map
Longest high-voltage lines
| Between | Voltage | Length |
|---|---|---|
| Post Rock β Axtell | 345 kV | 221 km |
| Fort Thompson | 345 kV | 198 km |
| Laramie River | 345 kV | 198 km |
| Gentleman β Sweetwater | 345 kV | 192 km |
| Substation names not reported | 345 kV | 191 km |
| Gentleman β Sweetwater | 345 kV | 159 km |
| Moore β Pauline | 345 kV | 158 km |
| Keystone | 345 kV | 129 km |
| Gentleman β Red Willow | 345 kV | 122 km |
| Cooper β Fairport | 345 kV | 121 km |
| Red Willow β Mingo | 345 kV | 120 km |
| Substation names not reported | 345 kV | 111 km |
| Columbus East | 345 kV | 107 km |
| Hoskins β Raun | 345 kV | 105 km |
| Cooper β Saint Joseph | 345 kV | 104 km |
| Raun β Fort Calhoun | 345 kV | 104 km |
| Cooper β Moore | 345 kV | 102 km |
| Sweetwater | 345 kV | 102 km |
| Stegall | 345 kV | 96.3 km |
| Axtell β Pauline | 345 kV | 78.5 km |
| Nebraska City | 345 kV | 77.5 km |
| Sweetwater β Axtell | 345 kV | 73.6 km |
| Moore | 345 kV | 73.2 km |
| Sarpy County β Nebraska City | 345 kV | 72.6 km |
| Hoskins | 345 kV | 64.9 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- WAPA-- Western Area Power Administration3,405 km Β· 772 km at 345 kV+
- Omaha Public Power District2,194 km Β· 549 km at 345 kV+
- Dawson Power District1,456 km
- Nebraska Public Power District842 km
- Loup River Public Power Dist576 km Β· 83.8 km at 345 kV+
- Lincoln Electric System461 km Β· 113 km at 345 kV+
- Custer Public Power District461 km
- Tri-state G & T Assn, Inc440 km Β· 294 km at 345 kV+
- Wheat Belt Public Power Dist386 km Β· 129 km at 345 kV+
- Midwest Energy Inc341 km Β· 341 km at 345 kV+
- Black Hills Power, Inc.233 km
- City Of Hastings - (ne)209 km
- Kbr Rural Public Power District142 km
- Highline Electric Assn136 km
- City Of Gering - (ne)134 km
- High West Energy, Inc93.1 km
- Burt County Public Power Dist93.0 km
- Wyrulec Company58.0 km
- Perennial Public Power Dist56.8 km
- Westar Energy Inc56.2 km
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants