United States βΊ Grid βΊ Transmission lines βΊ North Carolina
OCTARY USA Β· TRANSMISSIONTransmission lines in North Carolina
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Map
Longest high-voltage lines
| Between | Voltage | Length |
|---|---|---|
| Wake | 500 kV | 138 km |
| Newport Tie | 500 kV | 131 km |
| Jocassee Tie | 500 kV | 114 km |
| Cumberland β Wake | 500 kV | 109 km |
| Cumberland β Richmond | 500 kV | 91.4 km |
| Mcguire β Antioch | 500 kV | 88.1 km |
| Antioch β Jacksons Ferry | 500 kV | 86.4 km |
| Pleasant Garden β Woodleaf Switching Station | 500 kV | 85.6 km |
| Pleasant Garden | 500 kV | 80.0 km |
| Mcguire | 500 kV | 79.0 km |
| Mayo β Durham | 500 kV | 73.6 km |
| Newport Tie β Mcguire | 500 kV | 52.4 km |
| Woodleaf Switching Station β Mcguire | 500 kV | 48.6 km |
| Durham β Wake | 500 kV | 45.3 km |
| Mayo β Person | 500 kV | 16.5 km |
| James E. Rogers Energy Complex | 500 kV | 2.0 km |
| Mcguire | 500 kV | 1.3 km |
| Mcguire | 500 kV | 1.3 km |
| Richmond | 500 kV | 0.5 km |
| Mayo | 500 kV | 0.4 km |
| James E. Rogers Energy Complex | 500 kV | 0.1 km |
| Weatherspoon Plant Station | 230 kV | 125 km |
| Cane River β Nagel | 230 kV | 97.8 km |
| Cane River β Nagel | 230 kV | 97.8 km |
| Wallace | 230 kV | 88.4 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Duke Energy Carolinas, LLC7,815 km Β· 336 km at 345 kV+
- Progress Energy Carolinas Inc4,510 km Β· 0.5 km at 345 kV+
- Duke Energy Progress - (nc)4,385 km Β· 200 km at 345 kV+
- Virginia Electric & Power Co1,197 km
- Blue Ridge Elec Member Corp - (nc)243 km
- Tennessee Valley Authority44.4 km
- Appalachian Power Co17.9 km
- Brookfield Smoky Mountain Hydropower LLC16.0 km
- Edgecombe-martin County E M C9.4 km
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants