Longest high-voltage lines
| Between | Voltage | Length |
|---|---|---|
| Duval | 500 kV | 203 km |
| Fortson β North Tifton | 500 kV | 188 km |
| Bonaire | 500 kV | 145 km |
| North Tifton | 500 kV | 132 km |
| Blandford β Thalmann | 500 kV | 131 km |
| Duval β Thalmann | 500 kV | 127 km |
| Warthen Substation | 500 kV | 126 km |
| Warthen Substation | 500 kV | 122 km |
| West Mcintosh | 500 kV | 115 km |
| South Hall | 500 kV | 111 km |
| Thalmann | 500 kV | 104 km |
| Raccoon Creek | 500 kV | 99.9 km |
| Thomson Primary β Vogtle | 500 kV | 89.3 km |
| Tenaska Georgia β Fortson | 500 kV | 88.5 km |
| O'hara | 500 kV | 84.3 km |
| Klondike | 500 kV | 78.9 km |
| Bonaire | 500 kV | 73.0 km |
| Dresden β O'hara | 500 kV | 69.0 km |
| Thomson Primary β Warthen Substation | 500 kV | 62.8 km |
| Substation names not reported | 500 kV | 56.3 km |
| Raccoon Creek β North Tifton | 500 kV | 55.5 km |
| South Hall β Norcross | 500 kV | 52.7 km |
| Villa Rica β Union | 500 kV | 48.0 km |
| Villa Rica β Union | 500 kV | 48.0 km |
| Bowen Substation β Villa Rica | 500 kV | 45.1 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants