United States βΊ Grid βΊ Transmission lines βΊ California
OCTARY USA Β· TRANSMISSIONTransmission lines in California
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Map
Longest high-voltage lines
| Between | Voltage | Length |
|---|---|---|
| Celilo β Sylmar East | 1000 kV | 1,360 km |
| Substation names not reported | 200 kV | 83.2 km |
| Intermountain β Adelanto | 500 kV | 786 km |
| Intermountain β Adelanto | 500 kV | 786 km |
| Adelanto β Mccullough | 500 kV | 325 km |
| Tracy | 500 kV | 313 km |
| Lugo | 500 kV | 285 km |
| Lugo β Mohave | 500 kV | 283 km |
| Adelanto | 500 kV | 273 km |
| Mccullough β Victorville | 500 kV | 259 km |
| Mccullough β Victorville | 500 kV | 259 km |
| Substation names not reported | 500 kV | 240 km |
| Los Banos β Midway | 500 kV | 234 km |
| Table Mt. | 500 kV | 218 km |
| Vincent β Midway | 500 kV | 182 km |
| Vincent β Midway | 500 kV | 182 km |
| Round Mountain | 500 kV | 152 km |
| Round Mountain | 500 kV | 152 km |
| Round Mountain β Table Mt. | 500 kV | 144 km |
| Round Mountain β Table Mt. | 500 kV | 144 km |
| Suncrest β Imperial Valley | 500 kV | 144 km |
| Rinaldi β Victorville | 500 kV | 138 km |
| Midway | 500 kV | 136 km |
| Table Mt. β Vaca-dixon | 500 kV | 135 km |
| Midway | 500 kV | 135 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Pacific Gas & Electric Company24,324 km Β· 2,259 km at 345 kV+
- Southern California Edison9,228 km Β· 2,382 km at 345 kV+
- Azusa Light & Power5,229 km Β· 79.3 km at 345 kV+
- San Diego Gas & Electric2,911 km Β· 279 km at 345 kV+
- Ladwp2,603 km Β· 1,490 km at 345 kV+
- Imperial Irrigation District2,107 km
- Intermountain Power Agency1,572 km Β· 1,572 km at 345 kV+
- Pacificorp1,407 km
- Bonneville Power Administration1,360 km Β· 1,360 km at 345 kV+
- Sacramento Municipal Utility District1,306 km
- Los Angeles Department Of Water & Power385 km
- Plumas-sierra Rural Electric Cooperative225 km
- WAPA203 km
- Turlock Irrigation District198 km
- Southern California Edsion192 km Β· 50.9 km at 345 kV+
- Lassen Municipal Utility District184 km
- Modesto Irrigation District168 km
- Arizona Public Service Company166 km
- Ccsf161 km
- Surprise Valley Electrification Corporation160 km
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants