United States βΊ Grid βΊ Transmission lines βΊ New Mexico
OCTARY USA Β· TRANSMISSIONTransmission lines in New Mexico
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Map
Longest high-voltage lines
| Between | Voltage | Length |
|---|---|---|
| Alamogordo Solar Energy Center Substation | HVDC | 0.2 km |
| Four Corners | 500 kV | 289 km |
| Four Corners | 500 kV | 0.4 km |
| Substation names not reported | 500 kV | 0.4 km |
| West Mesa β Arroyo | 345 kV | 326 km |
| Springerville | 345 kV | 322 km |
| Substation names not reported | 345 kV | 266 km |
| Four Corners | 345 kV | 255 km |
| Eddy Ac-dc-ac Tie | 345 kV | 254 km |
| Four Corners | 345 kV | 254 km |
| West Mesa β Four Corners | 345 kV | 251 km |
| Substation names not reported | 345 kV | 248 km |
| Eddy Ac-dc-ac Tie β Amrad | 345 kV | 202 km |
| Springerville β Greenlee | 345 kV | 178 km |
| Springerville | 345 kV | 173 km |
| Springerville | 345 kV | 173 km |
| Pinto β Four Corners | 345 kV | 163 km |
| Substation names not reported | 345 kV | 146 km |
| Substation names not reported | 345 kV | 146 km |
| Guadalupe | 345 kV | 145 km |
| Luna | 345 kV | 137 km |
| Guadalupe | 345 kV | 113 km |
| Substation names not reported | 345 kV | 100.0 km |
| Greenlee | 345 kV | 96.5 km |
| Luna | 345 kV | 91.9 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Navajo Tribal Utility Authority934 km Β· 290 km at 345 kV+
- Public Service Company Of New Mexico582 km Β· 1.0 km at 345 kV+
- Lea County Electric Cooperative467 km
- Farmer's Electirc Cooperative466 km
- Roosevelt County Electric Cooperative421 km Β· 0.4 km at 345 kV+
- El Paso Electric Power Company416 km Β· 97.2 km at 345 kV+
- Xcel Energy403 km Β· 169 km at 345 kV+
- Southwest Public Service Company397 km
- Jemez Mountain Electric Cooperative280 km
- Tri-state G & T Assn, Inc270 km Β· 70.8 km at 345 kV+
- Central New Mexico Electric Cooperative211 km
- Southwestern Public Service Co200 km Β· 100.0 km at 345 kV+
- Mora-san Miguel Electric Cooperative191 km
- Springer Electric Cooperative180 km
- Deming Electric Power Cooperative171 km
- Pacificorp163 km Β· 163 km at 345 kV+
- Continental Divide Electic Cooperative163 km
- Otero County Electric Cooperative158 km Β· 0.2 km at 345 kV+
- Kit Carson Electric Cooperative147 km
- Southwestern Electric Cooperative130 km
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants