United States β€Ί Grid β€Ί Transmission lines β€Ί Arizona

OCTARY USA Β· TRANSMISSION

Transmission lines in Arizona

The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.

Line sections1,099mapped segments
Route length22,035 km13,692 mi
345 kV and above8,658 kmthe backbone
Owners29utilities and others

Map

Loading lines…
500 kV345 kV220–287 kV100–161 kVUnder 100 kVVoltage not reported

Longest high-voltage lines

220 kV and above, highest voltage first
BetweenVoltageLengthOwnerState
Mead500 kV390 km Owner not reportedAZ, NV
Crystal – Navajo500 kV359 km WAPA-- Western Area Power AdministrationAZ, NV
Pinal Central500 kV352 km Owner not reportedAZ
Substation names not reported500 kV346 km Owner not reportedAZ, NV
Substation names not reported500 kV333 km Owner not reportedAZ
Substation names not reported500 kV328 km Owner not reportedAZ
Coronado – Silver King500 kV291 km Owner not reportedAZ
Four Corners500 kV289 km Navajo Tribal Utility AuthorityNM, AZ
Imperial Valley500 kV130 km San Diego Gas & ElectircAZ, CA
Substation names not reported500 kV126 km Arizona Public Service CompanyAZ
Substation names not reported500 kV123 km Navajo Tribal Utility AuthorityAZ
Colorado River500 kV108 km Southern California EdisonCA, AZ
Substation names not reported500 kV104 km Owner not reportedAZ
Palo Verde500 kV99.4 km Owner not reportedAZ
Cedar Mountain500 kV85.0 km Owner not reportedAZ
Jojoba500 kV84.7 km Owner not reportedAZ
Pinal West500 kV83.0 km Owner not reportedAZ
Coronado500 kV80.1 km Owner not reportedAZ
Cedar Mountain500 kV79.6 km Arizona Public Service CompanyAZ
Substation names not reported500 kV76.3 km Arizona Public Service CompanyAZ
Pinal Central – Browning500 kV75.4 km Owner not reportedAZ
Palo Verde500 kV73.0 km Arizona Public Service CompanyAZ
Palo Verde – Perkins500 kV72.6 km Arizona Public Service CompanyAZ
Substation names not reported500 kV71.6 km Arizona Public Service CompanyAZ
Silver King – Browning500 kV61.9 km Owner not reportedAZ

Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants