United States βΊ Grid βΊ Transmission lines βΊ North Dakota
OCTARY USA Β· TRANSMISSIONTransmission lines in North Dakota
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Map
Longest high-voltage lines
| Between | Voltage | Length |
|---|---|---|
| Coal Creek β Dickinson | 400 kV | 700 km |
| Antelope Valley Station β Broadland | 345 kV | 481 km |
| Grand Forks β Center 345kv Switchyard | 345 kV | 401 km |
| Leland Olds β Fort Thompson | 345 kV | 392 km |
| Leland Olds β Groton | 345 kV | 342 km |
| Alexandria β Bison | 345 kV | 218 km |
| Ellendale 345 Kv | 345 kV | 212 km |
| Center 345kv Switchyard | 345 kV | 200 km |
| Charlie Creek β Antelope Valley Station | 345 kV | 112 km |
| Judson β Tande | 345 kV | 98.3 km |
| Buffalo | 345 kV | 90.0 km |
| Charlie Creek β Blue | 345 kV | 73.1 km |
| Antelope Valley Station β Red | 345 kV | 72.9 km |
| Charlie Creek β Belfield | 345 kV | 65.7 km |
| Center 345kv Switchyard β Coyote | 345 kV | 55.5 km |
| Leland Olds β Antelope Valley Station | 345 kV | 49.8 km |
| Leland Olds β Antelope Valley Station | 345 kV | 49.5 km |
| Blue β White | 345 kV | 46.3 km |
| Blue β Judson | 345 kV | 45.9 km |
| Buffalo β Bison | 345 kV | 34.8 km |
| Charlie Creek β Red | 345 kV | 34.1 km |
| Tande | 345 kV | 32.2 km |
| Maple River β Bison | 345 kV | 19.6 km |
| Coyote | 345 kV | 1.6 km |
| Antelope Valley Station | 345 kV | 0.8 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Otter Tail Power Co11,142 km Β· 144 km at 345 kV+
- Montana-dakota Utilities Co5,721 km Β· 1,015 km at 345 kV+
- WAPA-- Western Area Power Administration1,044 km Β· 392 km at 345 kV+
- Allete, Inc.747 km
- Delano Municipal Utilities700 km Β· 700 km at 345 kV+
- Otter Tail Company212 km Β· 212 km at 345 kV+
- Sheridan Electric Coop, Inc77.3 km
- Unknown59.8 km
- Lower Yellowstone R E A, Inc13.7 km
- Xcel Energy7.2 km
- Basin Electric Power Coop0.1 km
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants