United States βΊ Grid βΊ Transmission lines βΊ Maryland
OCTARY USA Β· TRANSMISSIONTransmission lines in Maryland
The high-voltage lines that carry electricity from power plants to cities, with voltage, owner and the substations at each end. Click a state to drill down, or a line on the map for details.
Map
Longest high-voltage lines
| Between | Voltage | Length |
|---|---|---|
| Doubs β New Creek Wind | 500 kV | 147 km |
| Calvert Cliffs β Waugh Chapel | 500 kV | 77.6 km |
| Calvert Cliffs β Waugh Chapel | 500 kV | 77.5 km |
| Conastone | 500 kV | 77.5 km |
| Conastone | 500 kV | 64.8 km |
| Burches Hill | 500 kV | 52.7 km |
| Doubs β Bedington | 500 kV | 51.9 km |
| Brighton β Waugh Chapel | 500 kV | 44.3 km |
| Rock Springs β Keeney | 500 kV | 43.6 km |
| Chalk Point β Calvert Cliffs | 500 kV | 29.7 km |
| Doubs β Goose Creek | 500 kV | 29.7 km |
| Brighton | 500 kV | 29.3 km |
| Brighton | 500 kV | 29.3 km |
| Doubs | 500 kV | 27.2 km |
| Conastone β Peach Bottom | 500 kV | 26.9 km |
| Chalk Point | 500 kV | 24.7 km |
| Rock Springs β Peach Bottom | 500 kV | 12.2 km |
| Burches Hill | 500 kV | 7.4 km |
| Calvert Cliffs | 500 kV | 0.4 km |
| Calvert Cliffs | 500 kV | 0.4 km |
| Calvert Cliffs | 500 kV | 0.4 km |
| Rock Springs | 500 kV | 0.2 km |
| Rock Springs | 500 kV | 0.2 km |
| Substation names not reported | 500 kV | 0.2 km |
| Substation names not reported | 500 kV | 0.0 km |
Line length by state
Click a state to drill down.
Largest owners
By route length in this view. Click to map their lines.
- Baltimore Gas & Electric Co1,983 km Β· 201 km at 345 kV+
- Delmarva Power1,339 km Β· 0.4 km at 345 kV+
- The Potomac Edison Company855 km Β· 79.1 km at 345 kV+
- Potomac Electric Power Co815 km Β· 7.4 km at 345 kV+
- Virginia Electric & Power Co517 km
- The Potomac Edison Co439 km Β· 147 km at 345 kV+
- Peco Energy Co131 km Β· 82.7 km at 345 kV+
- Allegheny Power Systems29.5 km
- Unknown0.1 km
Source: Homeland Infrastructure Foundation-Level Data (HIFLD), Electric Power Transmission Lines. HIFLD Open closed in September 2025; this is the last public version (August 2025). Lines are mapped from imagery and utility filings; some voltages and owners are not reported. Lengths are route lengths of the mapped sections. Interconnection queues Β· US power plants