United States βΊ Grid βΊ Interconnection queues βΊ Texas
ONSHORE WIND Β· ERCOTTriangle Ranch Echo
Triangle Ranch Echo is a 101 MW onshore wind request suspended in the ERCOT interconnection queue, in Cottle County, Texas.
Queue statusPaused / redesign
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Aug 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 25INR0181
- Grid region
- ERCOT (Texas)
- Location
- Cottle County, Texas
- Technology
- Wind: 101 MW
- Total requested
- 101 MW
- Queue status
- Suspended
- Entered queue
- 14 September 2022
- Proposed online date
- August 2025
Location
Marker shows the centre of Cottle County; the queue data does not give exact sites.
Other requests in Cottle County
- Solar project GEN-2018-015, Cottle CountySolar Β· 252 MW Β· agreement signed
- Triangle Ranch AlphaOnshore wind Β· 302 MW Β· in study
- Solar project GEN-2024-317, Cottle CountySolar Β· 300 MW Β· in study
- Soluce Cotton SolarSolar + storage Β· 203 MW Β· in study
- Soluce Cotton StorageSolar + storage Β· 202 MW Β· in study
- Triangle Ranch BravoOnshore wind Β· 200 MW Β· in study
- Triangle Ranch CharlieOnshore wind Β· 200 MW Β· suspended
- Triangle Ranch DeltaOnshore wind Β· 102 MW Β· suspended
- Triangle Ranch FoxOnshore wind Β· 101 MW Β· suspended
- Battery storage project GEN-2023-228, Cottle CountyBattery storage Β· 250 MW Β· withdrawn
- Comet SolarSolar Β· 152 MW Β· withdrawn
- Obsidian SolarSolar Β· 60.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem