SOLAR Β· ERCOT

Obsidian Solar

Obsidian Solar is a 60.0 MW solar request withdrawn in the ERCOT interconnection queue, in Cottle County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2017 (completed)
  2. Withdrawn / abandonedOct 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
20INR0014
Grid region
ERCOT (Texas)
Developer
Innovative Solar 144
Connection point (POI)
6131 Padr 69kV
Location
Cottle County, Texas
Technology
Solar: 60.0 MW
Total requested
60.0 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
10 July 2017
Proposed online date
April 2024
Withdrawn
October 2023

Location

Marker shows the centre of Cottle County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Cottle County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem