OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Delaware
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Maryland Offshore Wind Energy Project (MOWEP) Offshore wind |
248 MW | Paused / redesign |
| Battery storage project AH2-051, New Castle County Battery storage |
200 MW | In study |
| Battery storage project AH2-077, Sussex County Battery storage |
150 MW | In study |
| Solar project AH1-672, Sussex County Solar Β· TerraForm Freeman Solar, LLC |
75.0 MW | In study |
| Cedar Creek Solar Solar |
20.0 MW | Paused / redesign |
| Cedar Creek Solar Solar |
20.0 MW | Paused / redesign |
| Raceway Solar Solar |
20.0 MW | Agreement signed |
| Solar project AG2-447, New Castle County Solar Β· Freepoint Solar LLC |
20.0 MW | In study |
| Raceway Solar Solar |
20.0 MW | Agreement signed |
| Cedar Creek Solar Solar |
19.8 MW | Paused / redesign |
| Cedar Creek Solar Solar |
19.8 MW | Paused / redesign |
| Cedar Creek Solar Solar |
18.8 MW | Paused / redesign |
| Cedar Creek Solar Solar |
15.9 MW | Paused / redesign |
| Raceway Solar Solar |
10.0 MW | Agreement signed |
| Other project AI2-025, New Castle County Other |
10.0 MW | In study |
| Maryland Offshore Wind Energy Project (MOWEP) Offshore wind |
7.3 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)