United States βΊ Grid βΊ Interconnection queues βΊ Maine
OCTARY USA Β· INTERCONNECTION QUEUESInterconnection queue in Maine
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar Solar |
180 MW | In study |
| Green Apple Solar Solar |
179 MW | Agreement signed |
| Solar Solar |
165 MW | Agreement signed |
| Battery Storage Addition (to QP1086) Solar + storage |
160 MW | Agreement signed |
| Three Rivers Solar Solar |
100 MW | Agreement signed |
| Warren Meadow Solar Solar |
74.5 MW | Agreement signed |
| Solar Knox Solar |
33.5 MW | Agreement signed |
| BD Solar Church Hill Solar |
20.0 MW | Agreement signed |
| GDC Saco Solar Solar |
20.0 MW | Agreement signed |
| Turner Meadow Solar Solar |
19.8 MW | Agreement signed |
| Twin Energy Wind Onshore wind |
18.3 MW | Agreement signed |
| SolarFairfield Solar |
18.1 MW | Agreement signed |
| West Baldwin Solar Solar |
17.1 MW | Agreement signed |
| Emery Meadow Solar Solar |
16.4 MW | Agreement signed |
| Solar Solar |
7.0 MW | Agreement signed |
| Roxbury Solar Solar |
2.0 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines Β· Planned power plants (EIA)