United States › Grid › Interconnection queues › Virginia
BATTERY STORAGE · PJMBattery storage project AH2-246, Prince George County
Battery storage project AH2-246, Prince George County is a 100 MW battery storage request in interconnection study in the PJM interconnection queue, in Prince George County, Virginia, connecting to Dominion.
- PlanningQueued Mar 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AH2-246
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Polyester S/S 230kV
- Location
- Prince George County, Virginia
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Active
- Entered queue
- 9 March 2022
- Proposed online date
- December 2025
Location
Marker shows the centre of Prince George County; the queue data does not give exact sites.
Other requests in Prince George County
- Battery storage project AH2-378, Prince George CountyBattery storage · 100 MW · in study
- Battery storage project AI1-088, Prince George CountyBattery storage · 50.0 MW · in study
- Battery storage project AI1-087, Prince George CountyBattery storage · 50.0 MW · in study
- Solar project AG2-095, Prince George CountySolar · 18.0 MW · in study
- Bakers Pond SolarSolar · 100 MW · suspended
- Fort Powhatan SolarSolar · 150 MW · built
- Gas project X1-080, Prince George CountyGas · 135 MW · withdrawn
- Solar + storage project AG2-093, Prince George CountySolar + storage · 100 MW · withdrawn
- Solar + storage project AG2-523, Prince George CountySolar + storage · 100 MW · withdrawn
- Fort Powhatan SolarSolar · 80.0 MW · withdrawn
- Warwick PVISolar · 60.0 MW · withdrawn
- Solar + storage project AG1-544, Prince George CountySolar + storage · 60.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem