SOLAR Β· PJM

Warwick PVI

Warwick PVI is a 60.0 MW solar request withdrawn in the PJM interconnection queue, in Prince George County, Virginia, connecting to Dominion.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2017 (completed)
  2. Withdrawn / abandonedFeb 2021 (project stopped here)
  3. ConsentedOct 2020 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AC2-078
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
Dominion
Connection point (POI)
Disputanta-Waverly 115kV
Location
Prince George County, Virginia
Technology
Solar: 60.0 MW
Total requested
60.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Withdrawn
Entered queue
28 February 2017
Agreement signed
20 October 2020
Proposed online date
December 2022
Withdrawn
February 2021

Location

Marker shows the centre of Prince George County; the queue data does not give exact sites.

Power plants in Virginia Β· Transmission lines in Virginia

Other requests in Prince George County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem