SOLAR · PJMFort Powhatan Solar
Fort Powhatan Solar is a 80.0 MW solar request withdrawn in the PJM interconnection queue, in Prince George County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2015 (completed)
- Withdrawn / abandonedOct 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AA2-177
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Hopewell-Surry 230kV
- Location
- Prince George County, Virginia
- Technology
- Solar: 80.0 MW
- Total requested
- 80.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 30 April 2015
- Proposed online date
- November 2021
- Withdrawn
- October 2017
Location
Marker shows the centre of Prince George County; the queue data does not give exact sites.
Other requests in Prince George County
- Battery storage project AH2-246, Prince George CountyBattery storage · 100 MW · in study
- Battery storage project AH2-378, Prince George CountyBattery storage · 100 MW · in study
- Battery storage project AI1-088, Prince George CountyBattery storage · 50.0 MW · in study
- Battery storage project AI1-087, Prince George CountyBattery storage · 50.0 MW · in study
- Solar project AG2-095, Prince George CountySolar · 18.0 MW · in study
- Bakers Pond SolarSolar · 100 MW · suspended
- Fort Powhatan SolarSolar · 150 MW · built
- Gas project X1-080, Prince George CountyGas · 135 MW · withdrawn
- Solar + storage project AG2-093, Prince George CountySolar + storage · 100 MW · withdrawn
- Solar + storage project AG2-523, Prince George CountySolar + storage · 100 MW · withdrawn
- Warwick PVISolar · 60.0 MW · withdrawn
- Solar + storage project AG1-544, Prince George CountySolar + storage · 60.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem