SOLAR Β· PJMBakers Pond Solar
Bakers Pond Solar is a 100 MW solar request suspended in the PJM interconnection queue, in Prince George County, Virginia, connecting to Dominion.
Queue statusPaused / redesign
- PlanningQueued Sep 2018 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jul 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AE1-149
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Disputanta-Poe 115 kV
- Location
- Prince George County, Virginia
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Suspended
- Entered queue
- 24 September 2018
- Proposed online date
- July 2026
Location
Marker shows the centre of Prince George County; the queue data does not give exact sites.
Other requests in Prince George County
- Battery storage project AH2-246, Prince George CountyBattery storage Β· 100 MW Β· in study
- Battery storage project AH2-378, Prince George CountyBattery storage Β· 100 MW Β· in study
- Battery storage project AI1-088, Prince George CountyBattery storage Β· 50.0 MW Β· in study
- Battery storage project AI1-087, Prince George CountyBattery storage Β· 50.0 MW Β· in study
- Solar project AG2-095, Prince George CountySolar Β· 18.0 MW Β· in study
- Fort Powhatan SolarSolar Β· 150 MW Β· built
- Gas project X1-080, Prince George CountyGas Β· 135 MW Β· withdrawn
- Solar + storage project AG2-093, Prince George CountySolar + storage Β· 100 MW Β· withdrawn
- Solar + storage project AG2-523, Prince George CountySolar + storage Β· 100 MW Β· withdrawn
- Fort Powhatan SolarSolar Β· 80.0 MW Β· withdrawn
- Warwick PVISolar Β· 60.0 MW Β· withdrawn
- Solar + storage project AG1-544, Prince George CountySolar + storage Β· 60.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem