United States βΊ Grid βΊ Interconnection queues βΊ Virginia
GAS Β· PJMGas project X1-080, Prince George County
Gas project X1-080, Prince George County is a 135 MW gas request withdrawn in the PJM interconnection queue, in Prince George County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2011 (completed)
- Withdrawn / abandonedJun 2014 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- X1-080
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Connection point (POI)
- Poe-Suffolk 115kV
- Location
- Prince George County, Virginia
- Technology
- Gas: 135 MW
- Total requested
- 135 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 28 April 2011
- Proposed online date
- June 2015
- Withdrawn
- June 2014
Location
Marker shows the centre of Prince George County; the queue data does not give exact sites.
Other requests in Prince George County
- Battery storage project AH2-246, Prince George CountyBattery storage Β· 100 MW Β· in study
- Battery storage project AH2-378, Prince George CountyBattery storage Β· 100 MW Β· in study
- Battery storage project AI1-088, Prince George CountyBattery storage Β· 50.0 MW Β· in study
- Battery storage project AI1-087, Prince George CountyBattery storage Β· 50.0 MW Β· in study
- Solar project AG2-095, Prince George CountySolar Β· 18.0 MW Β· in study
- Bakers Pond SolarSolar Β· 100 MW Β· suspended
- Fort Powhatan SolarSolar Β· 150 MW Β· built
- Solar + storage project AG2-093, Prince George CountySolar + storage Β· 100 MW Β· withdrawn
- Solar + storage project AG2-523, Prince George CountySolar + storage Β· 100 MW Β· withdrawn
- Fort Powhatan SolarSolar Β· 80.0 MW Β· withdrawn
- Warwick PVISolar Β· 60.0 MW Β· withdrawn
- Solar + storage project AG1-544, Prince George CountySolar + storage Β· 60.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem