United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESGas interconnection queue in the USA
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Schahfer CCGTs Gas · NIPSCO |
2,740 MW | In study |
| Gas project J3996, St. Charles County Gas |
2,220 MW | In study |
| Gas project AG2-582, Doddridge County Gas · CPV Shay, LLC |
2,100 MW | In study |
| Smarr CC Gas |
2,000 MW | In study |
| Gas project 489, Roane County Gas |
1,689 MW | In study |
| Prairie Ridge (Gas - CC) Gas · Tenaska Power Generation, LLC |
1,660 MW | In study |
| Richland Parish generators Gas · Entergy Louisiana, LLC |
1,640 MW | In study |
| Richland Parish generators Gas · Entergy Louisiana, LLC |
1,640 MW | In study |
| Franklin Farms Gas · Entergy Louisiana, LLC |
1,640 MW | In study |
| Gas project 977726, Rowan County Gas |
1,620 MW | In study |
| Gas project 483, Stewart County Gas |
1,600 MW | In study |
| Gas project 628, Todd County Gas |
1,600 MW | In study |
| Gas project 620, Trousdale County Gas |
1,600 MW | In study |
| Gas project J3999, Vermillion County Gas |
1,540 MW | In study |
| Aegle Power Gas · Aegle Power LLC |
1,536 MW | In study |
| Gas project J4071, Livingston Parish County Gas |
1,500 MW | In study |
| Caldwell County Energy Center Gas · Caldwell County Energy Center, LLC |
1,500 MW | In study |
| Gas project J4024, Monroe County Gas |
1,499 MW | In study |
| Gas project J4025, Monroe County Gas |
1,499 MW | In study |
| Gas project 958347, Person County Gas · Duke Energy Progress, LLC |
1,455 MW | In study |
| Gas project J3799, Livingston County Gas |
1,452 MW | In study |
| Gas project 957264, Anderson County Gas |
1,450 MW | In study |
| Gas project J3922, Branch County Gas |
1,445 MW | In study |
| Gas project J3923, Washtenaw County Gas |
1,414 MW | In study |
| Gas project GEN-2024-340, Creek County Gas |
1,400 MW | In study |
| Gas project 977731, Davidson County Gas |
1,395 MW | In study |
| Mule Deer Run Gas Gas · BOULEVARD ASSOCIATES, LLC |
1,381 MW | In study |
| BasRanch (TEF - Due Diligence) Gas · CPV Basin Ranch, LLC |
1,350 MW | Agreement signed |
| Gas project GEN-2024-377, Harrison County Gas |
1,350 MW | In study |
| Gas project GEN-2024-379, Bossier Parish County Gas |
1,350 MW | In study |
| Gas project J4113, Cerro Gordo County Gas |
1,315 MW | In study |
| Gas project GEN-2024-132, Johnston County Gas |
1,300 MW | In study |
| Gas project AH1-680, Carroll County Gas · Chestnut Run Energy LLC |
1,300 MW | In study |
| Sandow Lakes Energy Station Gas · SL Energy Power Plant I, LLC |
1,292 MW | In study |
| Jewett Energy Center 1 Gas Gas · Jewett Energy Center LLC |
1,274 MW | In study |
| Maidsville CCGT Gas |
1,270 MW | Paused / redesign |
| Gas project J3935, Genesee County Gas |
1,268 MW | In study |
| Tolar Energy Center Gas · NRG Tolar Power LLC |
1,252 MW | In study |
| Limitless Energy Hub I Gas · Limitless Energy Hub I LLC |
1,238 MW | In study |
| Limitless Energy Hub II Gas · Limitless Energy Hub II LLC |
1,238 MW | In study |
| Replacing 464.5 MW Steam/Gas with 97.8 MW Steam; DOW Chem Gas |
1,232 MW | In study |
| Red Oak Ridge Energy Center Gas · Invenergy |
1,211 MW | In study |
| Gas project E0016, Calumet County Gas · Invenergy |
1,211 MW | In study |
| Wolf Bone North Energy Center Gas · NRG Wolf Bone Energy Center LLC |
1,204 MW | In study |
| Gas project J4164, Dane County Gas |
1,203 MW | In study |
| Gas project J4165, Kenosha County Gas |
1,203 MW | In study |
| Gas project J4014, Calumet County Gas |
1,203 MW | In study |
| Aviation Gas |
1,200 MW | In study |
| Eagle Pines Gas Gas · FGE Power |
1,174 MW | In study |
| Replace 1163.3 MW of Sabine Units 3, 4 & 1 with 2 on 1 Combined Cycle Gas Turbine facility; Sabine 1 Gas |
1,166 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- MISO (Midcontinent)116 · 70.9 GW
- Southeast (non-ISO utilities)214 · 65.0 GW
- ERCOT (Texas)104 · 45.7 GW
- SPP (Southwest Power Pool)78 · 35.0 GW
- West (non-ISO utilities)122 · 29.2 GW
- PJM (Mid-Atlantic, Midwest)44 · 14.0 GW
- CAISO (California)8 · 3,493 MW
- ISO-NE (New England)2 · 74.6 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)