United States › Grid › Interconnection queues › Texas
GAS · MISOReplace 1163.3 MW of Sabine Units 3, 4 & 1 with 2 on 1 Combined Cycle Gas Turbine facility; Sabine 1
Replace 1163.3 MW of Sabine Units 3, 4 & 1 with 2 on 1 Combined Cycle Gas Turbine facility; Sabine 1 is a 1,166 MW gas request in interconnection study in the MISO interconnection queue, in Orange County, Texas, connecting to ENTERGY TEXAS, INC..
- PlanningQueued Aug 2020 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget May 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- R1003
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY TEXAS, INC.
- Connection point (POI)
- Sabine 138 & 230 kV (bus #334440, #334431, #334433
- Location
- Orange County, Texas
- Technology
- Gas: 1,166 MW · Other
- Total requested
- 1,166 MW
- Service type
- Network resource (NRIS)
- Queue status
- Active
- Entered queue
- 5 August 2020
- Proposed online date
- May 2026
Location
Marker shows the centre of Orange County; the queue data does not give exact sites.
Other requests in Orange County
- Solar project J3045, Orange CountySolar · 300 MW · in study
- Gas project J1834, Orange CountyGas · 126 MW · in study
- Solar + storage project J2953, Orange CountySolar + storage · 400 MW · withdrawn
- Battery storage project J3123, Orange CountyBattery storage · 150 MW · withdrawn
- Solar project J502, Orange CountySolar · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem