United States › Grid › Interconnection queues › Texas

GAS · MISO

Replace 1163.3 MW of Sabine Units 3, 4 & 1 with 2 on 1 Combined Cycle Gas Turbine facility; Sabine 1

Replace 1163.3 MW of Sabine Units 3, 4 & 1 with 2 on 1 Combined Cycle Gas Turbine facility; Sabine 1 is a 1,166 MW gas request in interconnection study in the MISO interconnection queue, in Orange County, Texas, connecting to ENTERGY TEXAS, INC..

Queue statusIn planning
  1. PlanningQueued Aug 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget May 2026 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
R1003
Grid region
MISO (Midcontinent)
Utility / transmission owner
ENTERGY TEXAS, INC.
Connection point (POI)
Sabine 138 & 230 kV (bus #334440, #334431, #334433
Location
Orange County, Texas
Technology
Gas: 1,166 MW · Other
Total requested
1,166 MW
Service type
Network resource (NRIS)
Queue status
Active
Entered queue
5 August 2020
Proposed online date
May 2026

Location

Marker shows the centre of Orange County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Orange County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem