GAS · MISOGas project J1834, Orange County
Gas project J1834, Orange County is a 126 MW gas request in interconnection study in the MISO interconnection queue, in Orange County, Texas, connecting to ENTERGY TEXAS, INC..
Queue statusIn planning
- PlanningQueued Dec 2021 (current stage)
- ConsentedFeb 2024 (not yet reached)
- Construction (not yet reached)
- OperatingTarget May 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J1834
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY TEXAS, INC.
- Connection point (POI)
- Sabine 138/230 kV Substation
- Location
- Orange County, Texas
- Technology
- Gas: 126 MW
- Total requested
- 126 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA In Process; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 16 December 2021
- Agreement signed
- 21 February 2024
- Proposed online date
- May 2025
Location
Marker shows the centre of Orange County; the queue data does not give exact sites.
Other requests in Orange County
- Replace 1163.3 MW of Sabine Units 3, 4 & 1 with 2 on 1 Combined Cycle Gas Turbine facility; Sabine 1Gas · 1,166 MW · in study
- Solar project J3045, Orange CountySolar · 300 MW · in study
- Solar + storage project J2953, Orange CountySolar + storage · 400 MW · withdrawn
- Battery storage project J3123, Orange CountyBattery storage · 150 MW · withdrawn
- Solar project J502, Orange CountySolar · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem