United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Cobra Clean Energy Center

Cobra Clean Energy Center is a 100 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Brazoria County, Texas.

Queue statusIn planning
  1. PlanningQueued Feb 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Oct 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
26INR0374
Grid region
ERCOT (Texas)
Developer
Cobra Clean Energy Center LLC
Connection point (POI)
looped on circuit 04 between Mustang Bayou (#42960) and Hudson (#42100)
Location
Brazoria County, Texas
Technology
Battery: 100 MW
Total requested
100 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
2 February 2024
Proposed online date
October 2027

Location

Marker shows the centre of Brazoria County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Brazoria County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem