BATTERY STORAGE · ERCOT

AP Greenport

AP Greenport is a 101 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Travis County, Texas.

Queue statusIn planning
  1. PlanningQueued Jun 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Nov 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
23INR0474
Grid region
ERCOT (Texas)
Developer
AP Greenport
Connection point (POI)
Austrop – Lost Pines 345 kV transmission line (Bus #7040 – 9041)
Location
Travis County, Texas
Technology
Battery: 101 MW
Total requested
101 MW
Study phase
SS Completed, FIS Completed, No IA
Queue status
Active
Entered queue
10 June 2022
Proposed online date
November 2027

Location

Marker shows the centre of Travis County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Travis County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem