United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTAP Greenport
AP Greenport is a 101 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Travis County, Texas.
Queue statusIn planning
- PlanningQueued Jun 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Nov 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 23INR0474
- Grid region
- ERCOT (Texas)
- Developer
- AP Greenport
- Connection point (POI)
- Austrop – Lost Pines 345 kV transmission line (Bus #7040 – 9041)
- Location
- Travis County, Texas
- Technology
- Battery: 101 MW
- Total requested
- 101 MW
- Study phase
- SS Completed, FIS Completed, No IA
- Queue status
- Active
- Entered queue
- 10 June 2022
- Proposed online date
- November 2027
Location
Marker shows the centre of Travis County; the queue data does not give exact sites.
Other requests in Travis County
- Giga Texas Data CenterBattery storage · 133 MW · agreement signed
- Blackland Prairie 1 Energy StorageBattery storage · 102 MW · in study
- Blackland Prairie 2 Energy StorageBattery storage · 102 MW · in study
- Blackland Prairie 3 Energy StorageBattery storage · 102 MW · in study
- East Blackland Battery Storage SLFSolar + storage · 75.0 MW · in study
- Venture Hill StorageBattery storage · 70.4 MW · in study
- Giga Austin SolarSolar · -53.3 MW · in study
- East Blackland SolarSolar + storage · 144 MW · built
- Giga Texas Energy StorageOther · 131 MW · built
- Silicon Hill StorageOther · 105 MW · built
- Pflugerville 2 SolarSolar · 120 MW · withdrawn
- Lund StorageOther · 60.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem