United States › Grid › Interconnection queues › Texas
OTHER · ERCOTSilicon Hill Storage
Silicon Hill Storage is a 105 MW other request built and operating in the ERCOT interconnection queue, in Travis County, Texas.
Request details
- Queue ID
- 20INR0291
- Grid region
- ERCOT (Texas)
- Developer
- KCE TX 12, LLC
- Connection point (POI)
- 7336 L_GILLCR8_1Y 138kV
- Location
- Travis County, Texas
- Technology
- Other: 105 MW
- Total requested
- 105 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 14 October 2019
- Agreement signed
- 27 March 2020
- Proposed online date
- April 2023
- Came online
- April 2023
Location
Marker shows the centre of Travis County; the queue data does not give exact sites.
Other requests in Travis County
- Giga Texas Data CenterBattery storage · 133 MW · agreement signed
- Blackland Prairie 1 Energy StorageBattery storage · 102 MW · in study
- Blackland Prairie 2 Energy StorageBattery storage · 102 MW · in study
- Blackland Prairie 3 Energy StorageBattery storage · 102 MW · in study
- AP GreenportBattery storage · 101 MW · in study
- East Blackland Battery Storage SLFSolar + storage · 75.0 MW · in study
- Venture Hill StorageBattery storage · 70.4 MW · in study
- Giga Austin SolarSolar · -53.3 MW · in study
- East Blackland SolarSolar + storage · 144 MW · built
- Giga Texas Energy StorageOther · 131 MW · built
- Pflugerville 2 SolarSolar · 120 MW · withdrawn
- Lund StorageOther · 60.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem