United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Giga Texas Data Center

Giga Texas Data Center is a 133 MW battery storage request with a signed interconnection agreement in the ERCOT interconnection queue, in Travis County, Texas.

Queue statusConsented
  1. PlanningQueued Aug 2024 (completed)
  2. ConsentedApr 2025 (current stage)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2025 (not yet reached)
  5. Closed (not yet reached)

Request details

Queue ID
25INR0688
Grid region
ERCOT (Texas)
Developer
Giga Texas Energy, LLC
Connection point (POI)
HORNSBY Substation POIB# 7047 Site will be connected behind the meter at Medium Voltage 24.9 kV with non export controls GSU TRANSFORMER 80/106/133MVA 345kV DELTA PRIMARY 24.9kV WYE-G SECONDARY Z=
Location
Travis County, Texas
Technology
Battery: 133 MW
Total requested
133 MW
Study phase
SS Completed, FIS Completed, IA
Queue status
Active
Entered queue
27 August 2024
Agreement signed
30 April 2025
Proposed online date
December 2025

Location

Marker shows the centre of Travis County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Travis County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem