United States › Grid › Interconnection queues › Texas
OTHER · ERCOTGiga Texas Energy Storage
Giga Texas Energy Storage is a 131 MW other request built and operating in the ERCOT interconnection queue, in Travis County, Texas.
Request details
- Queue ID
- 23INR0239
- Grid region
- ERCOT (Texas)
- Developer
- Giga Texas Energy, LLC.
- Connection point (POI)
- 7047 Hornsby 345kV
- Location
- Travis County, Texas
- Technology
- Other: 131 MW
- Total requested
- 131 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 19 April 2021
- Agreement signed
- 3 December 2021
- Proposed online date
- August 2024
- Came online
- August 2024
Location
Marker shows the centre of Travis County; the queue data does not give exact sites.
Other requests in Travis County
- Giga Texas Data CenterBattery storage · 133 MW · agreement signed
- Blackland Prairie 1 Energy StorageBattery storage · 102 MW · in study
- Blackland Prairie 2 Energy StorageBattery storage · 102 MW · in study
- Blackland Prairie 3 Energy StorageBattery storage · 102 MW · in study
- AP GreenportBattery storage · 101 MW · in study
- East Blackland Battery Storage SLFSolar + storage · 75.0 MW · in study
- Venture Hill StorageBattery storage · 70.4 MW · in study
- Giga Austin SolarSolar · -53.3 MW · in study
- East Blackland SolarSolar + storage · 144 MW · built
- Silicon Hill StorageOther · 105 MW · built
- Pflugerville 2 SolarSolar · 120 MW · withdrawn
- Lund StorageOther · 60.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem