United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTPflugerville 2 Solar
Pflugerville 2 Solar is a 120 MW solar request withdrawn in the ERCOT interconnection queue, in Travis County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2018 (completed)
- Withdrawn / abandonedAug 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 20INR0061
- Grid region
- ERCOT (Texas)
- Developer
- RRE Power LLC 1
- Connection point (POI)
- tap 138kV 7336 Gillie - 3650 Elgin
- Location
- Travis County, Texas
- Technology
- Solar: 120 MW
- Total requested
- 120 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 4 March 2018
- Proposed online date
- June 2025
- Withdrawn
- August 2023
Location
Marker shows the centre of Travis County; the queue data does not give exact sites.
Other requests in Travis County
- Giga Texas Data CenterBattery storage Β· 133 MW Β· agreement signed
- Blackland Prairie 1 Energy StorageBattery storage Β· 102 MW Β· in study
- Blackland Prairie 2 Energy StorageBattery storage Β· 102 MW Β· in study
- Blackland Prairie 3 Energy StorageBattery storage Β· 102 MW Β· in study
- AP GreenportBattery storage Β· 101 MW Β· in study
- East Blackland Battery Storage SLFSolar + storage Β· 75.0 MW Β· in study
- Venture Hill StorageBattery storage Β· 70.4 MW Β· in study
- Giga Austin SolarSolar Β· -53.3 MW Β· in study
- East Blackland SolarSolar + storage Β· 144 MW Β· built
- Giga Texas Energy StorageOther Β· 131 MW Β· built
- Silicon Hill StorageOther Β· 105 MW Β· built
- Lund StorageOther Β· 60.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem