United States › Grid › Interconnection queues › Arkansas
SOLAR + STORAGE · MISOSolar + storage project J2773, Poinsett County
Solar + storage project J2773, Poinsett County is a 100 MW solar + storage request in interconnection study in the MISO interconnection queue, in Poinsett County, Arkansas, connecting to ENTERGY ARKANSAS.
- PlanningQueued Sep 2022 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- J2773
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ENTERGY ARKANSAS
- Connection point (POI)
- Newport - Fisher 161 kV Line
- Location
- Poinsett County, Arkansas
- Technology
- Solar: 100 MW · Battery
- Total requested
- 100 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 2; Post GIA Status: Not Started
- Queue status
- Active
- Entered queue
- 15 September 2022
- Proposed online date
- June 2027
Location
Marker shows the centre of Poinsett County; the queue data does not give exact sites.
Other requests in Poinsett County
- Battery storage project J4174, Poinsett CountyBattery storage · 140 MW · in study
- Solar project J3569, Poinsett CountySolar · 300 MW · withdrawn
- Solar project J2386, Poinsett CountySolar · 300 MW · withdrawn
- Solar project J3571, Poinsett CountySolar · 250 MW · withdrawn
- Solar project J3373, Poinsett CountySolar · 200 MW · withdrawn
- Solar project J3969, Poinsett CountySolar · 196 MW · withdrawn
- Solar + storage project J3536, Poinsett CountySolar + storage · 190 MW · withdrawn
- Solar project J2928, Poinsett CountySolar · 160 MW · withdrawn
- Solar project J948, Poinsett CountySolar · 100 MW · withdrawn
- Battery storage project J2521, Poinsett CountyBattery storage · 50.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem