Solar project J948, Poinsett County

Solar project J948, Poinsett County is a 100 MW solar request withdrawn in the MISO interconnection queue, in Poinsett County, Arkansas, connecting to Entergy.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2017 (completed)
  2. Withdrawn / abandonedJan 2019 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J948
Grid region
MISO (Midcontinent)
Utility / transmission owner
Entergy
Connection point (POI)
Harrisburg Tap - Harrisburg 161kV Line
Location
Poinsett County, Arkansas
Technology
Solar: 100 MW
Total requested
100 MW
Service type
Energy only (ERIS)
Study phase
Study Phase: GIA; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
16 June 2017
Proposed online date
June 2020
Withdrawn
January 2019

Location

Marker shows the centre of Poinsett County; the queue data does not give exact sites.