United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in the USA — page 43
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Possum Kingdom Solar Solar + storage · PK Solar, LLC |
262 MW | In study |
| Yellow Cat Wind Onshore wind · Yellow Cat Wind LLC |
262 MW | Agreement signed |
| Charolais Solar Solar + storage · RWE Solar Development, LLC |
262 MW | In study |
| Miranda Solar Project Solar · Miranda Solar Project, LLC |
261 MW | Agreement signed |
| Dundee East B Wind Onshore wind · Felix 2, LLC |
261 MW | Agreement signed |
| Velociraptor BESS II Solar + storage · Greyhound BESS 3 LLC |
261 MW | In study |
| Sypert Branch Solar Project Solar · Sypert Branch Solar LLC |
261 MW | Agreement signed |
| Velociraptor BESS I Solar + storage · Greyhound BESS 2 LLC |
261 MW | In study |
| Solar project G0944, Morrow County Solar |
261 MW | In study |
| J90 Energy Storage Battery storage |
261 MW | Agreement signed |
| Verily Solar (FKA Cuello De Cuero Solar) Solar · NextEra Energy Interconnection Holdings, LLC |
261 MW | In study |
| Panhandle Flagship Solar 3 Solar + storage · Panhandle Solar Group Operating Company LLC |
260 MW | Agreement signed |
| Homestead Power (TEF-Due Diligence) Gas · Homestead Power LLC |
260 MW | In study |
| Ochoa Energy Storage Battery storage · Ochoa Energy Storage LLC |
260 MW | In study |
| Solar project IC-789, Decatur County Solar |
260 MW | Agreement signed |
| Battery storage project 897163, Wayne County Battery storage · Duke Energy Progress, LLC - HF Lee Energy - Storage |
260 MW | Agreement signed |
| Solar + storage project 2024-G3, Maricopa County Solar + storage |
260 MW | In study |
| Beacon Solar Solar · Beacon Solar, LLC |
260 MW | In study |
| Solar project IC-774, Mitchell County Solar |
260 MW | Agreement signed |
| Battery storage project AJ1-014, Will County Battery storage |
260 MW | In study |
| Mayapple Solar Solar |
260 MW | Agreement signed |
| Onshore wind project GEN-2017-120, Dickinson County Onshore wind |
260 MW | Agreement signed |
| Gas project 977773, Richmond County Gas |
260 MW | In study |
| Battery storage project PP00027, Wayne County Battery storage |
260 MW | In study |
| Red Holly Solar Solar + storage · GreenGo Energy |
260 MW | Agreement signed |
| Battery storage project IC-1144, Bartow County Battery storage |
260 MW | Paused / redesign |
| Jay Flat BESS Battery storage · Jay Flat BESS LLC |
259 MW | In study |
| Tule Wind Wind + storage |
259 MW | Agreement signed |
| Goodnight Wind II Onshore wind · FGE Goodnight II, LLC |
259 MW | Agreement signed |
| Surplus; Pleasant Valley Peaker Wind + storage |
259 MW | In study |
| Mystic Springs Renewable Energy Solar SLF Solar + storage · Mystic Spring Renewable Energy LLC |
259 MW | Agreement signed |
| Fika Battery storage |
259 MW | In study |
| Onshore wind project MPC04500, Grand Forks County Onshore wind |
258 MW | In study |
| Zeitgeist K Energy Center Battery storage |
258 MW | In study |
| Onshore wind project GEN-2017-149, Johnston County Onshore wind |
258 MW | Agreement signed |
| Battery storage project E0017, Lincoln County Battery storage · Union Electric Company d/b/a Ameren Missouri |
258 MW | In study |
| First Capitol BESS Battery storage · First Capitol BESS, LLC |
258 MW | Agreement signed |
| Horsepower BESS Battery storage · Horsepower BESS, LLC |
258 MW | In study |
| Drake BESS Battery storage · Mallard Energy Storage LLC |
257 MW | Agreement signed |
| Masava Storage Battery storage · Savannah Oaks Solar Project, LLC |
257 MW | In study |
| Annapurna Battery storage |
257 MW | In study |
| Captiva Energy Storage Battery storage |
257 MW | Agreement signed |
| Shepard Energy Storage Battery storage · Shepard Energy Storage LLC |
257 MW | Agreement signed |
| Nuclear project AH1-710, Salem County Nuclear · PSEG Nuclear LLC |
257 MW | In study |
| Saddlehorn Energy Storage Battery storage · Saddlehorn, LLC |
257 MW | In study |
| Van Zandt Energy Storage Battery storage · Rocky Mountain Energy Holdings, LLC |
257 MW | In study |
| Shamrock II Wind Onshore wind |
257 MW | Paused / redesign |
| Alila Solar Solar + storage · Electra Energy Project, LLC |
257 MW | Agreement signed |
| Rex Storage Battery storage · Rex BESS, LLC |
256 MW | In study |
| Bell County Morgan Storage Battery storage · DM-BCTRM, LLC |
256 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,857 · 519.1 GW
- ERCOT (Texas)1,986 · 447.3 GW
- MISO (Midcontinent)1,646 · 350.1 GW
- CAISO (California)429 · 188.6 GW
- Southeast (non-ISO utilities)1,067 · 161.4 GW
- SPP (Southwest Power Pool)692 · 152.4 GW
- PJM (Mid-Atlantic, Midwest)1,248 · 140.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)72 · 14.6 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)