United States › Grid › Interconnection queues › Missouri
BATTERY STORAGE · MISOBattery storage project E0017, Lincoln County
Battery storage project E0017, Lincoln County is a 258 MW battery storage request in interconnection study in the MISO interconnection queue, in Lincoln County, Missouri, connecting to Ameren Missouri.
- PlanningQueued Aug 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Aug 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- E0017
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Ameren Missouri
- Developer
- Union Electric Company d/b/a Ameren Missouri
- Connection point (POI)
- Harley-Pike 161kV
- Location
- Lincoln County, Missouri
- Technology
- Battery: 258 MW
- Total requested
- 258 MW
- Service type
- Network resource (NRIS)
- Study phase
- Request Status: Active; Post GIA Status: Not started
- Queue status
- Active
- Entered queue
- 6 August 2025
- Proposed online date
- August 2028
Location
Marker shows the centre of Lincoln County; the queue data does not give exact sites.