United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

SOLAR + STORAGE Β· MISO

Solar + storage project J2274, Lincoln County

Solar + storage project J2274, Lincoln County is a 170 MW solar + storage request withdrawn in the MISO interconnection queue, in Lincoln County, Missouri, connecting to AMEREN MISSOURI.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2021 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
J2274
Grid region
MISO (Midcontinent)
Utility / transmission owner
AMEREN MISSOURI
Connection point (POI)
Pike - Troy 161kV
Location
Lincoln County, Missouri
Technology
Solar: 170 MW Β· Battery
Total requested
170 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 2; Post GIA Status: Not Started
Queue status
Withdrawn
Entered queue
21 July 2021
Proposed online date
October 2024
Withdrawn
December 2025

Location

Marker shows the centre of Lincoln County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Lincoln County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem