BATTERY STORAGE · ERCOTOchoa Energy Storage
Ochoa Energy Storage is a 260 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Waller County, Texas.
Queue statusIn planning
- PlanningQueued Apr 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 26INR0114
- Grid region
- ERCOT (Texas)
- Developer
- Ochoa Energy Storage LLC
- Connection point (POI)
- Tap 138kV Katy (44420) - Franz (44260) Ckt 09
- Location
- Waller County, Texas
- Technology
- Battery: 260 MW
- Total requested
- 260 MW
- Study phase
- SS Completed, FIS Completed, No IA
- Queue status
- Active
- Entered queue
- 19 April 2023
- Proposed online date
- June 2027
Location
Marker shows the centre of Waller County; the queue data does not give exact sites.
Other requests in Waller County
- Ochoa Energy Storage IIBattery storage · 517 MW · in study
- Twinwood Solar 1Solar · 358 MW · in study
- Caladium BESSBattery storage · 201 MW · in study
- Augie BESSBattery storage · 201 MW · in study
- Maderagemela BESS1Battery storage · 154 MW · in study
- Parliament SolarSolar · 485 MW · built
- JuggernautOther · 100 MW · withdrawn
- Monaville SolarSolar · 100 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem