Monaville Solar

Monaville Solar is a 100 MW solar request withdrawn in the ERCOT interconnection queue, in Waller County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2019 (completed)
  2. Withdrawn / abandonedMar 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0252
Grid region
ERCOT (Texas)
Developer
Monaville Solar LLC
Connection point (POI)
7664 Sunnyside 69kV
Location
Waller County, Texas
Technology
Solar: 100 MW
Total requested
100 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
6 February 2019
Proposed online date
December 2021
Withdrawn
March 2020

Location

Marker shows the centre of Waller County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Waller County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem