United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTMonaville Solar
Monaville Solar is a 100 MW solar request withdrawn in the ERCOT interconnection queue, in Waller County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2019 (completed)
- Withdrawn / abandonedMar 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 21INR0252
- Grid region
- ERCOT (Texas)
- Developer
- Monaville Solar LLC
- Connection point (POI)
- 7664 Sunnyside 69kV
- Location
- Waller County, Texas
- Technology
- Solar: 100 MW
- Total requested
- 100 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 6 February 2019
- Proposed online date
- December 2021
- Withdrawn
- March 2020
Location
Marker shows the centre of Waller County; the queue data does not give exact sites.
Other requests in Waller County
- Ochoa Energy Storage IIBattery storage Β· 517 MW Β· in study
- Twinwood Solar 1Solar Β· 358 MW Β· in study
- Ochoa Energy StorageBattery storage Β· 260 MW Β· in study
- Caladium BESSBattery storage Β· 201 MW Β· in study
- Augie BESSBattery storage Β· 201 MW Β· in study
- Maderagemela BESS1Battery storage Β· 154 MW Β· in study
- Parliament SolarSolar Β· 485 MW Β· built
- JuggernautOther Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem