SOLAR Β· ERCOTParliament Solar
Parliament Solar is a 485 MW solar request built and operating in the ERCOT interconnection queue, in Waller County, Texas.
Request details
- Queue ID
- 23INR0044
- Grid region
- ERCOT (Texas)
- Developer
- Parliament Solar LLC
- Connection point (POI)
- Tap 345kV 44900 Zenith - 967 Gibbons Creek ckt 18
- Location
- Waller County, Texas
- Technology
- Solar: 485 MW
- Total requested
- 485 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 18 June 2020
- Agreement signed
- 26 May 2022
- Proposed online date
- November 2025
- Came online
- November 2025
Location
Marker shows the centre of Waller County; the queue data does not give exact sites.
Other requests in Waller County
- Ochoa Energy Storage IIBattery storage Β· 517 MW Β· in study
- Twinwood Solar 1Solar Β· 358 MW Β· in study
- Ochoa Energy StorageBattery storage Β· 260 MW Β· in study
- Caladium BESSBattery storage Β· 201 MW Β· in study
- Augie BESSBattery storage Β· 201 MW Β· in study
- Maderagemela BESS1Battery storage Β· 154 MW Β· in study
- JuggernautOther Β· 100 MW Β· withdrawn
- Monaville SolarSolar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem