United States › Grid › Interconnection queues › Texas

SOLAR · ERCOT

Twinwood Solar 1

Twinwood Solar 1 is a 358 MW solar request in interconnection study in the ERCOT interconnection queue, in Waller County, Texas.

Queue statusIn planning
  1. PlanningQueued Mar 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Oct 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
26INR0425
Grid region
ERCOT (Texas)
Developer
Twinwood PV1, LLC
Connection point (POI)
Tap 138kV 44750 FULSHR_S25_8 - 44860 TWINWD_S25_8
Location
Waller County, Texas
Technology
Solar: 358 MW
Total requested
358 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
22 March 2024
Proposed online date
October 2027

Location

Marker shows the centre of Waller County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Waller County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem