🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in the USA — page 44

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9,1872,001.0 GW
Active in queue2,001.0 GW9,187 requests
Agreement signed423.2 GW2,141 requests
Withdrawn24,2054,519.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9,187 requests · page 44 of 184
ProjectCapacityStatusLocationRegionQueuedOnline
Delamar Energy Storage 2
Battery storage
256 MWIn study Clark, NVCAISO Apr 2021target 2027
Sunburst BESS
Solar + storage · Indigo Solar, LLC
256 MWIn study San Patricio, TXERCOT Oct 2024target 2029
Hastings Park BESS
Battery storage · Brazos Roots BESS, LLC
256 MWAgreement signed Brazoria, TXERCOT Aug 2024target 2027
Commerce Energy Storage 3
Battery storage
256 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2031
Almande Energy Storage
Battery storage
256 MWIn study Merced, CACAISO Apr 2021target 2030
Delamar Energy Storage
Battery storage
256 MWAgreement signed Clark, NVCAISO Apr 2020target 2027
Sherman Energy Storage
Battery storage
256 MWIn study Contra Costa, CACAISO Apr 2021target 2031
Gateway Energy Storage 2
Battery storage
256 MWIn study San Diego, CACAISO Apr 2021target 2035
SanPat Solar II
Solar · CGRP 04, LLC
256 MWAgreement signed San Patricio, TXERCOT Feb 2022target 2027
Nautilus Heavy Storage
Battery storage · Nautilus Heavy Storage, LLC
256 MWIn study San Patricio, TXERCOT Dec 2023target 2028
Tulsita Solar
Solar · Ray Ranch Solar LLC
256 MWAgreement signed Goliad, TXERCOT Dec 2018target 2026
Leaning Tree BESS
Battery storage
256 MWPaused / redesign Throckmorton, TXERCOT Nov 2023target 2026
Maleza Storage II
Battery storage · Brush Storage, LLC
256 MWIn study Wharton, TXERCOT Feb 2024target 2027
Lonesome Dove BESS
Battery storage
256 MWPaused / redesign Throckmorton, TXERCOT Nov 2023target 2026
Champs Elysees BESS
Battery storage · Champs Elysees Renewables, LLC
256 MWIn study Milam, TXERCOT Aug 2024target 2027
Nouveau BESS
Battery storage · RamZ BESS, LLC
256 MWIn study Brown, TXERCOT Aug 2024target 2027
Gas project 07-020, Morrow County
Gas
256 MWPaused / redesign Morrow, ORWest Sep 2007target 2012
Sandbar Energy Storage
Battery storage
256 MWIn study San Diego, CACAISO Apr 2021target 2030
Solar + storage project ERAS-2025-018, Roosevelt County
Solar + storage
256 MWIn study Roosevelt, NMSPP Oct 2025target 2030
Solar project GEN-2024-063, Lamb County
Solar
256 MWIn study Lamb, TXSPP Oct 2024target 2027
Bayou Creek Solar
Solar · Ferrovial Energy US 1
256 MWIn study San Patricio, TXERCOT Dec 2024target 2028
Zeya BESS
Battery storage · BRP Zeya BESS LLC
255 MWAgreement signed Galveston, TXERCOT May 2021target 2026
Sierra Madre Solar
Solar · Sierra Madre Solar LLC
255 MWIn study Zapata, TXERCOT Jan 2020target 2027
Gas project GEN-2023-077, Cass County
Gas
255 MWIn study Cass, NESPP Oct 2023target 2028
Solar project J3050, Calhoun County
Solar
255 MWIn study Calhoun, MIMISO Jul 2025target 2027
Livingston Wind
Onshore wind · Livingston Wind Project, LLC
255 MWIn study Livingston, ILPJM Sep 2018target 2021
Vermilion Grove Wind
Onshore wind · Vermilion Grove Wind, LLC
255 MWIn study Vermillion, INPJM Sep 2019target 2022
Onshore wind project GEN-2018-067, Williams County
Onshore wind
255 MWAgreement signed Williams, NDSPP Oct 2018target 2028
Gipper Solar Farm
Solar · Gipper Solar Farm, LLC
255 MWIn study Whiteside, ILPJM Oct 2020target 2023
Gas project GEN-2023-078, Cass County
Gas
255 MWIn study Cass, NESPP Oct 2023target 2028
Solar project CLPT G18, Converse County
Solar · DUTC bn, LLC
255 MWAgreement signed Converse, WYWest Jun 2022target 2024
Onshore wind project J3971, Huron County
Onshore wind
255 MWIn study Huron, MIMISO Apr 2025target 2029
San Gabriel Solar
Solar + storage · San Gabriel Solar LLC
255 MWIn study Milam, TXERCOT Jan 2025target 2028
Ciervo Mountain Hybrid
Solar + storage
255 MWAgreement signed Fresno, CACAISO Apr 2021target 2029
Maleza Solar
Solar + storage · Brush Solar LLC
255 MWAgreement signed Wharton, TXERCOT Dec 2018target 2027
Maleza Solar II
Solar + storage · Brush Solar, LLC
255 MWIn study Wharton, TXERCOT Apr 2021target 2027
PowerVault BESS
Battery storage · SMT Elm Mott BESS
255 MWIn study Mclennan, TXERCOT Mar 2024target 2027
Sandrift Storage 1
Battery storage
255 MWAgreement signed Riverside, CACAISO Apr 2021target 2030
Sandrift Storage 2
Battery storage
255 MWAgreement signed Riverside, CACAISO Apr 2021target 2031
Railway BESS
Battery storage
255 MWPaused / redesign Rusk, TXERCOT Jan 2023target 2026
Staked Plains BESS
Battery storage
255 MWPaused / redesign Lubbock, TXERCOT Mar 2023target 2026
Roseland Solar
Solar · Enel Green Power Roseland Solar, LLC
254 MWAgreement signed Falls, TXERCOT Nov 2018target 2025
Onshore wind project J3361, Bay County
Onshore wind
254 MWIn study Bay, MIMISO Apr 2024target 2027
Roseland Solar II
Solar · Enel Green Power Roseland Solar, LLC
254 MWAgreement signed Falls, TXERCOT Oct 2021target 2025
Battery storage project GEN-2021-029, Linn County
Battery storage
254 MWIn study Linn, KSSPP May 2021target 2026
Grand Mesa BESS
Battery storage · PERRY GREEN POWER LLC
253 MWIn study Pecos, TXERCOT Aug 2024target 2027
Collier Ranch Solar
Solar
253 MWPaused / redesign Motley, TXERCOT Feb 2024
Armstrong Wind
Onshore wind · Big Sky Energy
253 MWPaused / redesign Armstrong, TXERCOT May 2016target 2020
North Rosamond Solar
Solar + storage
253 MWAgreement signed Kern, CACAISO Jul 20102019
Bayside II Solar
Solar
253 MWPaused / redesign Dewitt, TXERCOT Jul 2021target 2026
Page 44 of 184

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)