| Project | Capacity | Status |
|---|---|---|
| Delamar Energy Storage 2 Battery storage |
256 MW | In study |
| Sunburst BESS Solar + storage · Indigo Solar, LLC |
256 MW | In study |
| Hastings Park BESS Battery storage · Brazos Roots BESS, LLC |
256 MW | Agreement signed |
| Commerce Energy Storage 3 Battery storage |
256 MW | Agreement signed |
| Almande Energy Storage Battery storage |
256 MW | In study |
| Delamar Energy Storage Battery storage |
256 MW | Agreement signed |
| Sherman Energy Storage Battery storage |
256 MW | In study |
| Gateway Energy Storage 2 Battery storage |
256 MW | In study |
| SanPat Solar II Solar · CGRP 04, LLC |
256 MW | Agreement signed |
| Nautilus Heavy Storage Battery storage · Nautilus Heavy Storage, LLC |
256 MW | In study |
| Tulsita Solar Solar · Ray Ranch Solar LLC |
256 MW | Agreement signed |
| Leaning Tree BESS Battery storage |
256 MW | Paused / redesign |
| Maleza Storage II Battery storage · Brush Storage, LLC |
256 MW | In study |
| Lonesome Dove BESS Battery storage |
256 MW | Paused / redesign |
| Champs Elysees BESS Battery storage · Champs Elysees Renewables, LLC |
256 MW | In study |
| Nouveau BESS Battery storage · RamZ BESS, LLC |
256 MW | In study |
| Gas project 07-020, Morrow County Gas |
256 MW | Paused / redesign |
| Sandbar Energy Storage Battery storage |
256 MW | In study |
| Solar + storage project ERAS-2025-018, Roosevelt County Solar + storage |
256 MW | In study |
| Solar project GEN-2024-063, Lamb County Solar |
256 MW | In study |
| Bayou Creek Solar Solar · Ferrovial Energy US 1 |
256 MW | In study |
| Zeya BESS Battery storage · BRP Zeya BESS LLC |
255 MW | Agreement signed |
| Sierra Madre Solar Solar · Sierra Madre Solar LLC |
255 MW | In study |
| Gas project GEN-2023-077, Cass County Gas |
255 MW | In study |
| Solar project J3050, Calhoun County Solar |
255 MW | In study |
| Livingston Wind Onshore wind · Livingston Wind Project, LLC |
255 MW | In study |
| Vermilion Grove Wind Onshore wind · Vermilion Grove Wind, LLC |
255 MW | In study |
| Onshore wind project GEN-2018-067, Williams County Onshore wind |
255 MW | Agreement signed |
| Gipper Solar Farm Solar · Gipper Solar Farm, LLC |
255 MW | In study |
| Gas project GEN-2023-078, Cass County Gas |
255 MW | In study |
| Solar project CLPT G18, Converse County Solar · DUTC bn, LLC |
255 MW | Agreement signed |
| Onshore wind project J3971, Huron County Onshore wind |
255 MW | In study |
| San Gabriel Solar Solar + storage · San Gabriel Solar LLC |
255 MW | In study |
| Ciervo Mountain Hybrid Solar + storage |
255 MW | Agreement signed |
| Maleza Solar Solar + storage · Brush Solar LLC |
255 MW | Agreement signed |
| Maleza Solar II Solar + storage · Brush Solar, LLC |
255 MW | In study |
| PowerVault BESS Battery storage · SMT Elm Mott BESS |
255 MW | In study |
| Sandrift Storage 1 Battery storage |
255 MW | Agreement signed |
| Sandrift Storage 2 Battery storage |
255 MW | Agreement signed |
| Railway BESS Battery storage |
255 MW | Paused / redesign |
| Staked Plains BESS Battery storage |
255 MW | Paused / redesign |
| Roseland Solar Solar · Enel Green Power Roseland Solar, LLC |
254 MW | Agreement signed |
| Onshore wind project J3361, Bay County Onshore wind |
254 MW | In study |
| Roseland Solar II Solar · Enel Green Power Roseland Solar, LLC |
254 MW | Agreement signed |
| Battery storage project GEN-2021-029, Linn County Battery storage |
254 MW | In study |
| Grand Mesa BESS Battery storage · PERRY GREEN POWER LLC |
253 MW | In study |
| Collier Ranch Solar Solar |
253 MW | Paused / redesign |
| Armstrong Wind Onshore wind · Big Sky Energy |
253 MW | Paused / redesign |
| North Rosamond Solar Solar + storage |
253 MW | Agreement signed |
| Bayside II Solar Solar |
253 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,857 · 519.1 GW
- ERCOT (Texas)1,986 · 447.3 GW
- MISO (Midcontinent)1,646 · 350.1 GW
- CAISO (California)429 · 188.6 GW
- Southeast (non-ISO utilities)1,067 · 161.4 GW
- SPP (Southwest Power Pool)692 · 152.4 GW
- PJM (Mid-Atlantic, Midwest)1,248 · 140.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)72 · 14.6 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)