United States › Grid › Interconnection queues › Illinois

SOLAR · PJM

Gipper Solar Farm

Gipper Solar Farm is a 255 MW solar request in interconnection study in the PJM interconnection queue, in Whiteside County, Illinois, connecting to ComEd.

Queue statusIn planning
  1. PlanningQueued Oct 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Oct 2023 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AG1-462
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Developer
Gipper Solar Farm, LLC
Connection point (POI)
Cordova 345 kV
Location
Whiteside County, Illinois
Technology
Solar: 255 MW
Total requested
255 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study
Queue status
Active
Entered queue
1 October 2020
Proposed online date
October 2023

Location

Marker shows the centre of Whiteside County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Whiteside County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem