United States › Grid › Interconnection queues › Illinois
SOLAR · PJMGipper Solar Farm
Gipper Solar Farm is a 255 MW solar request in interconnection study in the PJM interconnection queue, in Whiteside County, Illinois, connecting to ComEd.
Queue statusIn planning
- PlanningQueued Oct 2020 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Oct 2023 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AG1-462
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Developer
- Gipper Solar Farm, LLC
- Connection point (POI)
- Cordova 345 kV
- Location
- Whiteside County, Illinois
- Technology
- Solar: 255 MW
- Total requested
- 255 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Active
- Entered queue
- 1 October 2020
- Proposed online date
- October 2023
Location
Marker shows the centre of Whiteside County; the queue data does not give exact sites.
Other requests in Whiteside County
- Onshore wind project AH2-270, Whiteside CountyOnshore wind · 300 MW · in study
- Solar project J2556, Whiteside CountySolar · 300 MW · in study
- Gipper Wind FarmOnshore wind · 191 MW · in study
- Battery storage project AH2-376, Whiteside CountyBattery storage · 153 MW · in study
- Solar project AI1-171, Whiteside CountySolar · 100 MW · in study
- Rock River ESSBattery storage · 0.5 MW · built
- Onshore wind project AG2-674, Whiteside CountyOnshore wind · 212 MW · withdrawn
- Solar project AD2-214, Whiteside CountySolar · 68.0 MW · withdrawn
- Solar project AD2-041, Whiteside CountySolar · 17.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem