United States › Grid › Interconnection queues › Illinois
BATTERY STORAGE · PJMRock River ESS
Rock River ESS is a 0.5 MW battery storage request built and operating in the PJM interconnection queue, in Whiteside County, Illinois, connecting to ComEd.
Request details
- Queue ID
- AG1-044
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Whiteside County
- Location
- Whiteside County, Illinois
- Technology
- Battery: 0.5 MW
- Total requested
- 0.5 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
- Queue status
- Operational
- Entered queue
- 1 July 2020
- Proposed online date
- July 2021
- Came online
- December 2021
Location
Marker shows the centre of Whiteside County; the queue data does not give exact sites.
Other requests in Whiteside County
- Onshore wind project AH2-270, Whiteside CountyOnshore wind · 300 MW · in study
- Solar project J2556, Whiteside CountySolar · 300 MW · in study
- Gipper Solar FarmSolar · 255 MW · in study
- Gipper Wind FarmOnshore wind · 191 MW · in study
- Battery storage project AH2-376, Whiteside CountyBattery storage · 153 MW · in study
- Solar project AI1-171, Whiteside CountySolar · 100 MW · in study
- Onshore wind project AG2-674, Whiteside CountyOnshore wind · 212 MW · withdrawn
- Solar project AD2-214, Whiteside CountySolar · 68.0 MW · withdrawn
- Solar project AD2-041, Whiteside CountySolar · 17.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem