United States › Grid › Interconnection queues › Illinois

BATTERY STORAGE · PJM

Rock River ESS

Rock River ESS is a 0.5 MW battery storage request built and operating in the PJM interconnection queue, in Whiteside County, Illinois, connecting to ComEd.

Queue statusOperating
  1. PlanningQueued Jul 2020 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingDec 2021 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
AG1-044
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
Whiteside County
Location
Whiteside County, Illinois
Technology
Battery: 0.5 MW
Total requested
0.5 MW
Service type
Energy only (ERIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
Queue status
Operational
Entered queue
1 July 2020
Proposed online date
July 2021
Came online
December 2021

Location

Marker shows the centre of Whiteside County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Whiteside County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem