🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Illinois

ONSHORE WIND · PJM

Gipper Wind Farm

Gipper Wind Farm is a 191 MW onshore wind request in interconnection study in the PJM interconnection queue, in Whiteside County, Illinois, connecting to ComEd.

Queue statusIn planning
  1. PlanningQueued Sep 2019 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2022 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
AF1-296
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Developer
Gipper Wind Farm, LLC
Connection point (POI)
Garden Plain 138 kV
Location
Whiteside County, Illinois
Technology
Wind: 191 MW
Total requested
191 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study
Queue status
Active
Entered queue
30 September 2019
Proposed online date
September 2022

Location

Marker shows the centre of Whiteside County; the queue data does not give exact sites.

Power plants in Illinois · Transmission lines in Illinois

Other requests in Whiteside County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem