ONSHORE WIND Β· PJM

Onshore wind project AG2-674, Whiteside County

Onshore wind project AG2-674, Whiteside County is a 212 MW onshore wind request withdrawn in the PJM interconnection queue, in Whiteside County, Illinois, connecting to ComEd.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2021 (completed)
  2. Withdrawn / abandonedDec 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AG2-674
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ComEd
Connection point (POI)
Quad Cities - Sterling Steel 345 kV
Location
Whiteside County, Illinois
Technology
Wind: 212 MW
Total requested
212 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
31 March 2021
Proposed online date
October 2023
Withdrawn
December 2024

Location

Marker shows the centre of Whiteside County; the queue data does not give exact sites.

Power plants in Illinois Β· Transmission lines in Illinois

Other requests in Whiteside County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem