SOLAR Β· PJMSolar project AD2-041, Whiteside County
Solar project AD2-041, Whiteside County is a 17.0 MW solar request withdrawn in the PJM interconnection queue, in Whiteside County, Illinois, connecting to ComEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2018 (completed)
- Withdrawn / abandonedFeb 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AD2-041
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Normandy
- Location
- Whiteside County, Illinois
- Technology
- Solar: 17.0 MW
- Total requested
- 17.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 24 January 2018
- Proposed online date
- December 2019
- Withdrawn
- February 2018
Location
Marker shows the centre of Whiteside County; the queue data does not give exact sites.
Other requests in Whiteside County
- Onshore wind project AH2-270, Whiteside CountyOnshore wind Β· 300 MW Β· in study
- Solar project J2556, Whiteside CountySolar Β· 300 MW Β· in study
- Gipper Solar FarmSolar Β· 255 MW Β· in study
- Gipper Wind FarmOnshore wind Β· 191 MW Β· in study
- Battery storage project AH2-376, Whiteside CountyBattery storage Β· 153 MW Β· in study
- Solar project AI1-171, Whiteside CountySolar Β· 100 MW Β· in study
- Rock River ESSBattery storage Β· 0.5 MW Β· built
- Onshore wind project AG2-674, Whiteside CountyOnshore wind Β· 212 MW Β· withdrawn
- Solar project AD2-214, Whiteside CountySolar Β· 68.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem