BATTERY STORAGE · ERCOTStaked Plains BESS
Staked Plains BESS is a 255 MW battery storage request suspended in the ERCOT interconnection queue, in Lubbock County, Texas.
Queue statusPaused / redesign
- PlanningQueued Mar 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Aug 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 25INR0313
- Grid region
- ERCOT (Texas)
- Location
- Lubbock County, Texas
- Technology
- Battery: 255 MW
- Total requested
- 255 MW
- Queue status
- Suspended
- Entered queue
- 12 March 2023
- Proposed online date
- August 2026
Location
Marker shows the centre of Lubbock County; the queue data does not give exact sites.
Other requests in Lubbock County
- Dunkel BESSBattery storage · 226 MW · in study
- Battery storage project GEN-2020-060, Lubbock CountyBattery storage · 200 MW · in study
- Battery storage project GEN-2024-355, Lubbock CountyBattery storage · 199 MW · in study
- R MassengaleGas · 58.0 MW · suspended
- Ty CookeGas · 33.0 MW · suspended
- BrandonGas · 21.0 MW · suspended
- Gas project GEN-2011-045, Lubbock CountyGas · 205 MW · built
- Gas project GEN-2010-006, Lubbock CountyGas · 205 MW · built
- Gas project GEN-2009-002, Lubbock CountyGas · 306 MW · withdrawn
- Battery storage project GEN-2022-141, Lubbock CountyBattery storage · 250 MW · withdrawn
- Battery storage project GEN-2024-356, Lubbock CountyBattery storage · 199 MW · withdrawn
- Gas project GEN-2009-001, Lubbock CountyGas · 128 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem