BATTERY STORAGE · SPPBattery storage project GEN-2020-060, Lubbock County
Battery storage project GEN-2020-060, Lubbock County is a 200 MW battery storage request in interconnection study in the SPP interconnection queue, in Lubbock County, Texas, connecting to SPS.
Queue statusIn planning
- PlanningQueued Apr 2020 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2020-060
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SPS
- Connection point (POI)
- Lubbock East Substation 230 kV
- Location
- Lubbock County, Texas
- Technology
- Battery: 200 MW
- Total requested
- 200 MW
- Service type
- Energy only (ERIS)
- Study phase
- IA PENDING
- Queue status
- Active
- Entered queue
- 30 April 2020
- Proposed online date
- June 2027
Location
Marker shows the centre of Lubbock County; the queue data does not give exact sites.
Other requests in Lubbock County
- Dunkel BESSBattery storage · 226 MW · in study
- Battery storage project GEN-2024-355, Lubbock CountyBattery storage · 199 MW · in study
- Staked Plains BESSBattery storage · 255 MW · suspended
- R MassengaleGas · 58.0 MW · suspended
- Ty CookeGas · 33.0 MW · suspended
- BrandonGas · 21.0 MW · suspended
- Gas project GEN-2011-045, Lubbock CountyGas · 205 MW · built
- Gas project GEN-2010-006, Lubbock CountyGas · 205 MW · built
- Gas project GEN-2009-002, Lubbock CountyGas · 306 MW · withdrawn
- Battery storage project GEN-2022-141, Lubbock CountyBattery storage · 250 MW · withdrawn
- Battery storage project GEN-2024-356, Lubbock CountyBattery storage · 199 MW · withdrawn
- Gas project GEN-2009-001, Lubbock CountyGas · 128 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem