WIND + STORAGE · MISO

Surplus; Pleasant Valley Peaker

Surplus; Pleasant Valley Peaker is a 259 MW wind + storage request in interconnection study in the MISO interconnection queue, connecting to GREAT RIVER ENERGY.

Queue statusIn planning
  1. PlanningQueued Aug 2021 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Oct 2023 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1009
Grid region
MISO (Midcontinent)
Utility / transmission owner
GREAT RIVER ENERGY
Connection point (POI)
Pleasant Valley 161kV Substation
Technology
Wind: 259 MW · Other
Total requested
259 MW
Queue status
Active
Entered queue
17 August 2021
Proposed online date
October 2023

Location

No county location in the queue data.

Power plants in · Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem