WIND + STORAGE · MISOSurplus; Pleasant Valley Peaker
Surplus; Pleasant Valley Peaker is a 259 MW wind + storage request in interconnection study in the MISO interconnection queue, connecting to GREAT RIVER ENERGY.
Queue statusIn planning
- PlanningQueued Aug 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Oct 2023 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- S1009
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- GREAT RIVER ENERGY
- Connection point (POI)
- Pleasant Valley 161kV Substation
- Technology
- Wind: 259 MW · Other
- Total requested
- 259 MW
- Queue status
- Active
- Entered queue
- 17 August 2021
- Proposed online date
- October 2023
Location
No county location in the queue data.