United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in the USA — page 58

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9,1872,001.0 GW
Active in queue2,001.0 GW9,187 requests
Agreement signed423.2 GW2,141 requests
Withdrawn24,2054,519.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9,187 requests · page 58 of 184
ProjectCapacityStatusLocationRegionQueuedOnline
Sunlit Pines BESS SLF
Solar + storage · Sunlit Pines BESS LLC
208 MWIn study Nacogdoches, TXERCOT Apr 2024target 2027
Ferdinand Grid BESS II
Battery storage · Coval Infrastructure DevCo LLC
208 MWIn study Bexar, TXERCOT Dec 2024target 2027
Pearl Moon
Solar · Pearl Moon Solar, LLC
208 MWIn study Colorado, TXERCOT Sep 2023target 2029
Bypass Battery Storage
Battery storage · Bypass BESS LLC
208 MWAgreement signed Fort Bend, TXERCOT Aug 2021target 2025
Amite Energy Storage II
Battery storage · NextEra Energy Resources Development, LLC
208 MWIn study Tangipahoa Parish, LAMISO Aug 2025target 2028
Burnet Bay Storage
Battery storage · TOCE TX BESS 4, LLC
208 MWIn study Harris, TXERCOT Sep 2024target 2027
Umbra (Stockyard) Solar
Solar
208 MWPaused / redesign Franklin, TXERCOT Jan 2021target 2026
Anatole Renewable Energy Storage
Battery storage · Eustace Storage LLC
208 MWAgreement signed Henderson, TXERCOT Jun 2022target 2027
Gulf Prairie BESS
Solar + storage · Gulf Prairie Energy LLC
208 MWIn study Brazoria, TXERCOT Sep 2025target 2028
Cottonseed Energy Storage
Battery storage · Cottonseed Energy Storage LLC
208 MWIn study Wharton, TXERCOT Nov 2023target 2027
Pecan Energy Storage
Solar + storage
208 MWIn study Mitchell, GASoutheast Oct 2023target 2029
Woodland Energy Storage
Battery storage · Woodland Energy Storage, LLC
208 MWIn study Bosque, TXERCOT Dec 2023target 2030
Reforzar BESS 1
Battery storage · Tempus Power management LLC
208 MWIn study Brooks, TXERCOT Dec 2024target 2028
Reforzar Bess 2
Battery storage · Tempus Power management LLC
208 MWIn study Brooks, TXERCOT Dec 2024target 2028
Gas project 303, Colleton County
Gas
208 MWIn study Colleton, SCSoutheast May 2025target 2032
Gas project 302, Colleton County
Gas
208 MWIn study Colleton, SCSoutheast May 2025target 2032
Rockefeller Solar
Solar
208 MWPaused / redesign Schleicher, TXERCOT Oct 2019target 2027
Bravo BESS
Battery storage · Bravo BESS LLC
207 MWIn study Webb, TXERCOT Nov 2024target 2027
Longfellow Solar II
Solar + storage · CENTURY GAS PROCESSING, LLC
207 MWAgreement signed Pecos, TXERCOT Nov 2022target 2027
Erath County Solar
Solar · Erath County Solar, LLC
207 MWAgreement signed Erath, TXERCOT Mar 2021target 2029
Liberty Senate Energy Storage 1
Battery storage · Senate Solar LLC
207 MWIn study Jack, TXERCOT Oct 2021target 2027
Old Roman Energy Center
Battery storage · Nova Clean Energy LLC
207 MWIn study Reagan, TXERCOT Oct 2024target 2027
Pintail Pass BESS
Battery storage · Pintail Pass BESS, LLC
207 MWAgreement signed San Patricio, TXERCOT Apr 2022target 2026
Vertus Energy Storage
Battery storage · VERTUS ENERGY STORAGE LLC
207 MWAgreement signed Galveston, TXERCOT Oct 2023target 2026
Metro BESS
Battery storage · Metro BESS LLC
207 MWIn study Caldwell, TXERCOT Feb 2025target 2030
Alamosa Storage
Battery storage
207 MWPaused / redesign Wilbarger, TXERCOT Oct 2021
Aldrin 138 BESS
Battery storage · Aldrin Energy Storage LLC
207 MWAgreement signed Brazoria, TXERCOT May 2023target 2027
Battery storage project GEN-2019-011, Yoakum County
Battery storage
207 MWAgreement signed Yoakum, TXSPP Apr 2019target 2028
River Boat Storage
Solar + storage · Champion Creek Storage, LLC
207 MWIn study Mitchell, TXERCOT Oct 2024target 2028
St. Gall Solar
Solar · St. Gall Solar LLC
207 MWIn study Pecos, TXERCOT Feb 2022target 2026
Oak Belt Storage
Solar + storage · Oak Belt Storage, LLC
207 MWIn study Victoria, TXERCOT Dec 2025target 2029
Tapaderos Storage
Solar + storage · Tapaderos Storage, LLC
207 MWIn study Young, TXERCOT Nov 2024target 2028
BRP Hemera BESS
Battery storage · BRP Hemera BESS LLC
207 MWIn study Deaf Smith, TXERCOT Dec 2021target 2029
BRP Rhine BESS
Battery storage · BRP Rhine BESS LLC
207 MWIn study Ward, TXERCOT Aug 2020target 2028
BRP Volans BESS
Battery storage · BRP Volans BESS LLC
207 MWIn study Winkler, TXERCOT Aug 2020target 2027
BRP Pyxis BESS
Battery storage · BRP Pyxis BESS LLC
207 MWIn study Ward, TXERCOT Sep 2020target 2028
Hoyte Solar
Solar · Milano Solar LLC
207 MWAgreement signed Milam, TXERCOT Apr 2021target 2027
Rockefeller Storage
Battery storage · Mittel Rockefeller Storage LLC
207 MWAgreement signed Schleicher, TXERCOT Oct 2019target 2027
Sunlit Pines Solar SLF
Solar + storage · Sunlit Pines Energy Center LLC
207 MWIn study Nacogdoches, TXERCOT Mar 2024target 2027
Zunkerville BESS
Solar + storage · Zunkerville Energy, LLC
207 MWIn study Karnes, TXERCOT Sep 2025target 2028
Wolfram Storage
Battery storage · Nova Clean Energy, LLC
207 MWIn study Calhoun, TXERCOT May 2025target 2027
Fountain Point Solar
Solar · Fountain Point Solar Energy LLC
207 MWIn study Union, OHPJM Aug 2018target 2021
Octans
Solar + storage
207 MWIn study Fresno, CACAISO Apr 2023target 2031
Shackleford BESS
Battery storage · Shackelford County BESS LLC
207 MWIn study Shackelford, TXERCOT Dec 2024target 2028
Solar Star Bay City Storage
Battery storage · Solar Star Bay City Storage
206 MWIn study Matagorda, TXERCOT Dec 2023target 2029
Desert Jewel Storage
Battery storage
206 MWAgreement signed San Diego, CACAISO Apr 2021target 2029
Fornax
Solar + storage
206 MWIn study Fresno, CACAISO Apr 2023target 2031
Rover
Battery storage
206 MWIn study Los Angeles, CACAISO Apr 2023target 2028
Sultan Solar
Solar
206 MWPaused / redesign Bosque, TXERCOT Jun 2021target 2026
Fountain Wind
Onshore wind
206 MWAgreement signed Shasta, CACAISO Apr 2015target 2027
Page 58 of 184

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)