Pecan Energy Storage

Pecan Energy Storage is a 208 MW solar + storage request in interconnection study in the Southeast interconnection queue, in Mitchell County, Georgia, connecting to Georgia Transmission.

Queue statusIn planning
  1. PlanningQueued Oct 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Apr 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-187
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Georgia Transmission
Connection point (POI)
Raccoon Creek 230 kV SS
Location
Mitchell County, Georgia
Technology
Solar: 208 MW · Battery
Total requested
208 MW
Study phase
Facilities Study
Queue status
Active
Entered queue
20 October 2023
Proposed online date
April 2029

Location

Marker shows the centre of Mitchell County; the queue data does not give exact sites.

Power plants in Georgia · Transmission lines in Georgia

Other requests in Mitchell County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem