United States › Grid › Interconnection queues › Georgia

GAS · SOUTHEAST

Flint River 2 780 MW Unit

Flint River 2 780 MW Unit is a 780 MW gas request in interconnection study in the Southeast interconnection queue, in Mitchell County, Georgia, connecting to Georgia Transmission.

Queue statusIn planning
  1. PlanningQueued Mar 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GI-210
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Georgia Transmission
Connection point (POI)
Raccoon Creek Substation
Location
Mitchell County, Georgia
Technology
Gas: 780 MW
Total requested
780 MW
Study phase
Application under Review
Queue status
Active
Entered queue
29 March 2025
Proposed online date
June 2029

Location

Marker shows the centre of Mitchell County; the queue data does not give exact sites.

Power plants in Georgia · Transmission lines in Georgia

Other requests in Mitchell County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem