United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTUmbra (Stockyard) Solar
Umbra (Stockyard) Solar is a 208 MW solar request suspended in the ERCOT interconnection queue, in Franklin County, Texas.
Queue statusPaused / redesign
- PlanningQueued Jan 2021 (current stage)
- ConsentedOct 2022 (not yet reached)
- Construction (not yet reached)
- OperatingTarget Apr 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 23INR0155
- Grid region
- ERCOT (Texas)
- Location
- Franklin County, Texas
- Technology
- Solar: 208 MW
- Total requested
- 208 MW
- Queue status
- Suspended
- Entered queue
- 24 January 2021
- Agreement signed
- 11 October 2022
- Proposed online date
- April 2026
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Other requests in Franklin County
- Lupinus Solar 2Solar + storage Β· 242 MW Β· agreement signed
- Lupinus Solar 1Solar + storage Β· 162 MW Β· agreement signed
- Lupinus Storage 2Solar + storage Β· 125 MW Β· agreement signed
- Lupinus Solar 3Solar + storage Β· 101 MW Β· agreement signed
- Lupinus Storage 3Solar + storage Β· 50.9 MW Β· agreement signed
- Prairie Ridge (Gas - CC)Gas Β· 1,660 MW Β· in study
- Lazy Frog Solar SLFSolar + storage Β· 100 MW Β· in study
- Solar project GEN-2023-241, Franklin CountySolar Β· 93.0 MW Β· in study
- Lupinus Storage 1Solar + storage Β· 84.0 MW Β· in study
- Umbra (Stockyard) BESSBattery storage Β· 73.0 MW Β· suspended
- Umbra Solar IISolar Β· 345 MW Β· withdrawn
- Umbra BESS IIBattery storage Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem